Ministry of Energy, Ankara, Turkey

Type
Management Building of TR Ministry of Energy

AC
Air-conditioned

Roof area
250 m2

The construction of the roof
10 years old Sandwich Panel with eps heat isolation

The age of roof
10 years old


Roof condition:
The roof needed some repairements in glutters, connections, corners of chimneys.

1

Challenge

Water leakages, AC’s working in full power and not enough cooling inside Minister’s room.

2

Effect

Water leakages were repaired, Cooling effect works

3

Solution

2 layers of COOL-R ; 1kg Gray Cool-R+ 1kg White Cool-R with 45gr’s of local reinforcing textile.

1

Challenge

Water leakages, AC’s working in full power and not enough cooling inside Minister’s room.

2

Solution

2 layers of COOL-R ; 1kg Gray Cool-R+ 1kg White Cool-R with 45gr’s of local reinforcing textile.

3

Effect

Water leakages were repaired, Cooling effect works

Ask us for free calculation for your building
and see how much you can save

See more realizations

  • Cooling

  • Waterproofing

  • Reflection

  • Non spreading fire

  • Durability

We use cookies to facilitate the use of this service.
Modify the settings of your browser if you do not wish cookies to be saved on the hard drive of your computer. Read Privacy Policy. accept