Office Building, Varna, Bulgaria

Type
Office building

AC
Air-conditioned

Roof area
1200 m2

The construction of the roof
The bitumen felt was in good condition with some overlaps that needed touching. There were 120 holes made for fixing the structure that will support new AC units.

The age of roof
6 years old

Roof condition:
Concrete slab-XPS-Sloping concrete-two layers bitumen felts.

1

Challenge

Due to the need of installing additional AC units the waterproofing layer was penetrated on lots of spots which caused leaks in the rooms under the roof.

2

Solution

Abizol 2KS was used for repairing the areas around the holes. Than priming with EVOMER primer and two layers of COOL-R.

3

Effect

Seamless waterproofing layer that stopped the leaks under the roof. The cooling effect will be perceived next summer.

1

Challenge

Due to the need of installing additional AC units the waterproofing layer was penetrated on lots of spots which caused leaks in the rooms under the roof.

2

Effect

Seamless waterproofing layer that stopped the leaks under the roof. The cooling effect will be perceived next summer.

3

Solution

Abizol 2KS was used for repairing the areas around the holes. Than priming with EVOMER primer and two layers of COOL-R.

Ask us for free calculation for your building
and see how much you can save

See more realizations

  • Cooling

  • Waterproofing

  • Reflection

  • Non spreading fire

  • Durability

We use cookies to facilitate the use of this service.
Modify the settings of your browser if you do not wish cookies to be saved on the hard drive of your computer. Read Privacy Policy. accept