Production Plant, Istanbul, Turkey

Type
Production Plant (PP and PVC products)

AC
Air-conditioned

Roof area
1500 m2

The construction of the roof
concrete + vapour barrier + mineral wool (10cm.) + 1 layer of PVC membrane

The age of roof
6 years old

Roof condition:
Generally the roof was in a good condition. The PVC membrane kept good shape & quality. Nevertheless small water leakages appeared.

1

Challenge

The main identified problem was a high temperature level inside the offices located beneath the roof. There was also a need to waterproof the roof surface as several areas like roof corners, roof edges and roof outflows were affected

2

Solution

2 layers of COOL-R  (grey & white) 

3

Effect

Roof surface reinforced and protected from water and wind. Monitoring of temperature levels is pending.

1

Challenge

The main identified problem was a high temperature level inside the offices located beneath the roof. There was also a need to waterproof the roof surface as several areas like roof corners, roof edges and roof outflows were affected

2

Effect

Roof surface reinforced and protected from water and wind. Monitoring of temperature levels is pending.

3

Solution

2 layers of COOL-R  (grey & white) 

See more realizations

  • Cooling

  • Waterproofing

  • Reflection

  • Non spreading fire

  • Durability

We respect your privacy, that is why we would like to inform you that we have updated our Privacy policy. In order to give you clear information on how we process your personal data. In the following points we specify which of your personal data we are in possession of and how we use it. We have also added information regarding your rights, such as how you can access your data and how to request that it is no longer used.

Here you will find our Privacy policy and Cookie policy.

We use cookies to facilitate the use of this service.
Modify the settings of your browser if you do not wish cookies to be saved on the hard drive of your computer. Read Privacy Policy. accept